Construction Process Torre Hospitalet
During the month of March, floor 10 and core this floor 10-9 were concreted. The architectural prefabrication has been installed and the recessed installations have been carried out in houses on the 1st and 2nd floors. The watertightness test has been carried out on the 1st floor and the first side of the partition wall in the dwellings on the 4th floor. The prefabricated assembly of facades has also been carried out and insulation in prefabricated façade on floors 1 and 2.