Construction Process Residencia Sant Adrià
During the month of May, the stairs from the basement to the 2nd floor have been executed. Work has been done on partitions in the basement floor and the floor 3 ceiling slab has been concreted. The formwork system for the floor 3 ceiling slab has been made and coffered ceilings on floor 4 forged ceiling. Wood frames have also been stockpiled.