About Us

Our work strives to enhance our sense of surroundings, identity and relationship to others and the physical spaces we inhabit, whether feral or human-made.

Selected Awards
  • 2004 — Aga Khan Award for Architecture
  • 2009 — Mies van der Rohe Award
  • 2013 — AIA/ALA Library Building Award
  • 2015 — Best Interior, Designers Saturday
  • 2016 — AIA New York Honor Award

Construction Process Cambrils

During the month of July, the façade enclosures in P3ª continue and with the execution of partitions in partitions and the placement of profiles on dividing walls.

The 2 stairways of the tower have been concreted up to P7th and the roof of the 12th floor and the assembly of the sections of the crowning beam has begun. The laying of sheet metal ducts and downspouts has begun on floors 1 and 2 and screeds have been made up to P4. Modifications are made to the electrical installations of the sample floor.

Ir a Detalles del Proyecto