Construction Process Jeroni Pujades
During the month of September in building B, shower trays have been placed on the ground floor and the tiled bathrooms are being placed. In the A1 building, all the windows have been placed, electricity on the 3rd floor and plumbing on the 2nd floor. executed the pavement overgrowth in PB. The execution of concrete block partitions has been completed in the basement. 90% trays and 100% luminaires have been installed. The installation of waterproof sheeting on the front of the A1 building has begun on the façades. The assembly of the walls of the core of the two elevators on the ground floor has begun.